EXCAVATION DAMAGE
Every year, about 20% of all excavation work causes damage to utilities. That is about 41,000 cases. This means a direct damage of approximate € 35 million per year. By using the BlindGuide App, excavation damage can be prevented quickly and easily.



BLOG
IN THE MEDIA

Land+Water
FEATURES

Choose what you want to see

View all KLIC layers

Project the future situation

View all contact details of the interested parties

Project the current situation

Measure distance on the map
- between two points on the map;
- between a point on the map and your location.
This is useful if you want to know how far a utilitiy actually lies, for instance, from the facade.
Measure in augmented reality
- Measure the length of a cable or pipe in the slot quickly and easily;
- Measure quickly and easily the area of a plot in front of you.
This is useful if you want to know how far a utilitiy actually lies, for instance, from the facade.

View all KLIC attachments from the interested parties
BENEFITS

Cost saving

Avoiding conflict
.

Digital

CO2-footprint reduction
.

Risk-limiting

Accurate
.
CONTACT
We see excavation damage prevention as a joint effort
At BlindGuide we are happy to help you prevent excavation damage. Our years of experience in explosives detection, soil research and the cable and pipe industry help us to better inform you. The proven technology of BlindGuide and Euroradar guarantees an effective and efficient process for successfully preventing excavation damage.
Do you want more information or a live demonstration?
SOCIAL
Follow us
on
Follow us
on
Follow us
on